The 15-module solar mounting structure installed in a field

Solar Module Mounting Structure

We developed a manually adjustable mounting structure for a 15-module solar pumping system, combining mechanical design, fabrication detailing, a physical mock-up and structural assessment

Mahindra Susten / PDD

Solar Module Mounting Structure

01 / Design Intent

A central support for an adjustable array

The design brings the array, tracking mechanism and foundation connection into one assembly. Formed purlins support the modules. Rafters and bracing transfer their loads to the horizontal support and vertical post, while the bearing assembly allows the structure to rotate

Render of the mounting structure frame on its central post

The Product Envelope

  • 5,875 × 5,000 mm

    Overall length and width with modules, as recorded in the product and mock-up presentations

  • 232 kg

    Reported mock-up structure mass including hot-dip galvanizing

02 / Assembly Development

Building the structure in defined subassemblies

The CAD sequence separates the post and bearing, primary members, secondary supports, rafters and purlins. This makes the interfaces visible before fabrication and establishes the order in which the complete mounting system comes together

  • CAD render of the base plate and bearing on the pedestal

    Base and bearing

    The base plate, stiffeners, rotational stopper and bearing flanges establish the support and rotation interface

  • CAD render of the upper post with the controller bracket

    Upper post and brackets

    The upper post carries the tilt adjustment plate, top flange and the mechanical mounting frame for the controller

  • CAD render of the horizontal beam and bracing on the post

    Primary support members

    The horizontal beam, hinge plates and bracing connect the post to the array support structure

  • CAD render of the secondary RHS support members

    Secondary support members

    RHS members and angle-adjustment bracing extend the load path across the array

  • CAD render of the rafters and overhang supports

    Rafters and overhang support

    The rafter arrangement supports the span beyond the central frame and provides attachment points for the purlins

  • CAD render of the completed purlin grid

    Formed C-purlins

    The completed upper grid provides the fixing lines for the modules and distributes their loads into the rafters

03 / Manual Adjustment

Rotation and tilt integrated into the support

  • CAD render of the rotating head and ball races

    Rotating head and ball races

    The bearing assembly carries the upper structure while allowing manual rotation for daily tracking. Flanges, stiffeners and a stopper form part of the detailed arrangement

  • CAD render of the angle plate and adjustable bracing

    Angle plate and adjustable bracing

    The angular plate and bracing define the inclination setting. The connection geometry supports adjustment while maintaining a load path back to the central post

04 / Geometry & Clearances

Checking the operating envelope

General arrangement views describe the array in front and side elevation. The project presentation records a horizontal height of 1,532 mm, with near and far edge heights of 604 mm and 2,232 mm in the illustrated inclined position

  • Side elevation drawing of the inclined array

    Inclined side elevation

    The side view relates panel inclination, ground clearance and the position of the adjustment members

  • Front elevation drawing of the array on the central post

    Front elevation

    The front view establishes the span, symmetry and connection of the upper support frame to the central post

05 / Design for Fabrication

Assembly details that support manufacture

  • Drawing of the H-frame and its connections

    H-frame and connection detail

    The fabrication package defines the frame subassemblies, clevis interfaces and connection arrangement. This excerpt focuses on the geometry

  • Plan drawing of the purlin positions

    Purlin positions and fixings

    Plan and detail views establish purlin spacing and the fixing relationship to the supporting tubes. The archive also contains flat-pattern DXF files and parts lists

The mock-up record lists cutting, grinding, drilling, MIG welding, laser cutting and purlin roll forming. Drawing revisions, fastener schedules and packing checklists supported the work between component manufacture and site assembly

06 / Foundation & Site Preparation

Preparing the anchor interface

  • Reinforcement cage for the pedestal on site

    Reinforcement preparation

    The photographed reinforcement cage establishes the site preparation stage before the pedestal is cast

  • J-bolt anchor cage set in the ground

    Anchor-bolt positioning

    The J-bolt cage locates the fasteners that will receive the vertical-post base plate

  • Cast concrete pedestal with exposed anchor bolts

    Completed pedestal

    The exposed anchors provide the mounting interface for installing and securing the structure

07 / Physical Mock-up

Assembling and reviewing the complete structure

  • Side view of the installed array

    Installed side view

    The mock-up shows the complete array, its inclination and the central foundation in the actual site setting

  • Rear view of the supports beneath the modules

    Underside and support layout

    The rear view makes the purlin fixings, rafters and central bracing visible beneath the modules

Recorded fabrication duration
4 days
2 welders and 2 helpers
Recorded installation duration
2 h 30 min
2 technicians and 1 helper
Fasteners recorded
263
Installation included module fixing

08 / Finite Element Model

Tracing loads through the frame and connections

The structural model represents the upper frame, post, bearing region, brackets and bolted interfaces. The analysis reviews the assembly response together with local behaviour at the connections, where concentrated stress can develop

  • Structural geometry of the frame prepared for analysis

    Geometry prepared for analysis

    The structural arrangement is reviewed without the panel surfaces so the supporting members and connections can be represented explicitly

  • Meshed finite element model of the frame

    Meshed assembly

    The discretised model provides the basis for calculating deformation and stress under the defined dead-load and wind-load cases

  • Mesh of the head and horizontal support connection

    Head and horizontal support

    The model resolves the central connection between the horizontal member and the upper post

  • Mesh of the bracing and cleat connections

    Bracing and cleat connections

    Bracing interfaces are represented so local connection response can be inspected alongside global frame behaviour

  • Mesh of the post base with its restraint

    Base restraint

    The base restraint represents the foundation connection used by the model. This assumption governs the load path and resulting displacement

Loading basis used for the mock-up analysis

Load cases used in the mock-up analysis
LOAD CASEMODEL INPUTSASSESSMENT
Dead load219 kg structure + 15 panels at 25 kg eachSelf-weight and module payload
Dead load + windSame structural and panel loads, with panel wind pressuresFrame and connection response to wind

The 219 kg analysis mass and 232 kg galvanized mock-up mass are recorded on different bases. The wind study targets an equivalent wind speed of 150 km/h

09 / Wind-load Development

CFD to evaluate the pressure over the array

  • CFD domain around the inclined array

    Virtual wind-tunnel domain

    The array is placed in a surrounding air volume to study the flow around the inclined panels

  • Flow pathlines passing over the array

    Flow around the modules

    Pathlines illustrate how the approaching flow passes over and around the array, providing context for the panel pressure distribution

Velocity contour beneath and behind the array

Non-uniform panel loading

  • The velocity view shows the disturbed flow beneath and behind the array. The project presentation reports individual panel pressures between 208 Pa and 593 Pa for this wind setup These panel loads provide the input for the wind-load structural assessment

10 / FEA: Dead Load

Deformation and stress under the module weight

  • Dead-load deformation contour of the frame

    21.5 mm maximum deformation

    The dead-load result places the largest displacement at the free purlin edges. The contour shows how the central support and overhanging members respond together

  • Dead-load stress contour of the frame

    189 MPa reported maximum stress

    The assembly stress result directs attention to the post and its bracing connection. Component plots then examine the individual members and local interfaces

11 / FEA: Wind Load

Reviewing global movement and local peaks

  • Wind-load displacement contour of the frame

    Displacement under wind loading

    The contour places the largest movement at the purlin edges. The displayed maximum is approximately 53.5 mm for this model and load case

  • Wind-load stress contour of the frame

    Localized assembly stress

    The wind-load stress plot reports a local maximum of approximately 382 MPa. The analysis follows this with component plots to identify where the response is concentrated

The deformation value above follows the contour legend. Its source slide caption states 16.4 mm, while the report summary states 53 mm. Local peaks are retained here and are not treated as proof of structural acceptance

12 / Component-level Review

The post and rafter connection regions

  • Stress contour of the vertical post and bracing plate

    Vertical post and bracing interface

    The component result reports approximately 238 MPa near the bracing plate connection, identifying an interface for detailed review

  • Stress contour of the rafter and RHS members

    Rafter / RHS assembly

    The component result reports approximately 250 MPa. Comparing individual members makes the design review more specific than relying on a single assembly peak

The work combined the overall deformation pattern with stresses in the post, horizontal support, rafters, purlins and their connections. This provided a basis for reviewing member sizes, support positions and connection details within the analysed configuration

Outcome
The assembled 15-module mock-up on site

A developed mounting system, assembled and assessed

The project produced a detailed mechanical design and a physical 15-module mock-up. CAD, fabrication drawings and assembly records connected the design intent to the built structure CFD and FEA added a documented view of the wind loads, frame deformation and critical connection stresses

  • Industry Proven Frameworks
  • Get consultancy-level insights

Explore Detailed Case Study

Request a Quote

Tell us about your project

Fields marked * are required.

Choose a file (optional)

Drawings, CAD, images or ZIP (.pdf, .png, .jpg, .jpeg, .dwg, .dxf, .step, .stp, .iges, .igs, .stl, .zip), up to 15 MB.