The BESS container enclosure

Mahindra Susten GEN-E Container

We developed the BESS enclosure through mechanical design, engineering analysis and fabrication support.

Container Design and Development

BESS

Nominal container length
12 ft
Structural analysis programme
6 load cases
Thermal simulation input
50°C ambient

Development Programme

The engineering process

  1. Step 01: Define

    Equipment requirements, envelope, access & heat loads

  2. Step 02: Explore

    Module studies and alternative container arrangements

  3. Step 03: Integrate

    Structure, partitions, equipment and service interfaces

  4. Step 04: Evaluate

    Structural load cases, airflow & temperature distribution

  5. Step 05: Detail & support

    Drawings, BOMs, workshop feedback and revisions

Concept Development

The compact enclosure & it’s internal arrangement

BESS - Design/Development

Illustrative sketch of the BESS container's general arrangement

Illustrative sketch based on the 16 March 2020 general assembly drawings Overall dimension lines: 3657.6 × 2440 × 3686 mm

Early Design Studies

The ideas behind the container layout

  • Hand-written concept notes for the container layout

    Initial concept notes

    5 Essential UX Principles for Intuitive Product Design

  • Study of battery modules and cooling layout

    Module and cooling studies

    FE Analysis to validate the structural frame

  • Alternative container arrangements

    Container alternatives

    FE Analysis to validate the structural frame

Space Planning

Separate spaces for equipment and thermal control

General arrangement drawing of the container rooms

The general arrangement defines the equipment positions, access clearances and service routes.

  • Battery Room

    Insulated space with battery racks, air conditioning and a false ceiling

  • Equipment Room

    PCS, ACDB, UPS and control equipment share a dedicated service area

  • Rear service compartments

    The drawings place the outdoor AC unit and suppression cylinder above the transformer compartment

Mechanical Development

The structure and its internal assemblies

  1. 01 Base Frame & Super Structure

    CAD model of the base frame and superstructure

    Original project CAD

    We arranged the steel members around the equipment load paths. Corner fittings, frame connections and equipment supports form the structural basis of the enclosure

  2. 02 Insulations & Partitions

    CAD model of the insulated internal partitions

    Original project CAD

    Internal partitions separate the functional zones. Rockwool insulation and wall linings support thermal separation while accommodating the room layout and service openings.

  3. 03 Battery Room & False Ceiling

    CAD model of the battery room with racks and false ceiling

    Original project CAD

    The battery-room design coordinates rack access with the indoor AC unit and false ceiling. The ceiling arrangement manages supply and return airflow around the racks

  4. 04 Equipment & Service Access

    CAD model of the equipment room

    Original project CAD

    The equipment room brings the PCS, UPS rack and electrical panels into a serviceable arrangement. Mounting details and access space developed alongside the main enclosure

Equipment Integration

The interfaces that make the enclosure work

  1. 05 Ventilation and weather hoods

    Ventilation fan opening with external weather hood

    Original ventilation detail

    Fan openings and external hoods coordinate exhaust flow with the enclosure wall. Louvres, filters and rain protection form part of the air path

  2. 06 Local cooling for the UPS rack

    UPS rack with local cooling fans

    Original equipment detail

    The UPS rack detail incorporates local fans around the equipment. This brings the cooling provisions into the mechanical arrangement

  3. 07 Fire-system routing

    Fire-suppression piping arrangement above the battery racks

    Original piping arrangement, October 2020

    We coordinated pipe routes and nozzle positions with the battery racks and ceiling. The design reserves space for the cylinder and associated system interfaces

  4. 08 Cable routes and floor access

    Underfloor cable-tray plan

    Original cable-tray plan

    Underfloor trays organise the cable paths between equipment zones. Floor covers and gland interfaces provide access for installation and later service

Structural Analysis

The model, supports and applied loads

  • Meshed FEA model of the container structure

    CAD idealisation and mesh

  • FEA model showing equipment masses and mounts

    Equipment masses and mounts

  • FEA model with restraints at the ISO corners

    ISO-corner lifting restraints

Reports

Loading Conditions

Structural load cases
CASELOADING CONDITIONASSESSMENT FOCUS
01Self-weight + payload + 0.5 kN/m² walkway loadEquipment support and walkway response
02Self-weight + payload + floor / roof live loadsFloor 2.5 kN/m², roof 0.75 kN/m²
03Loaded bottom liftingFour bottom ISO corners
04Loaded top liftingFour top ISO corners
05Longitudinal wind + payloadExternal-flow pressures at 150 km/h
06Transverse wind + payloadExternal-flow pressures at 150 km/h

Structural Response

Deformation and Stress on a Component Level

  • Displacement contour plot of the container assembly

    2.32 mm maximum displacement

    The self-weight, payload and floor/roof live-load case shows the assembly response under the stated loading assumptions

  • Wall-panel stress plot under transverse wind

    Wall-panel stress under wind

    The transverse-wind plot displays a 120 MPa colour-scale cap. Its annotated maximum is approximately 231 MPa. Local peaks and broader panel response need separate interpretation

  • CFD pressure distribution on the container exterior

    CFD pressures inform the wind cases

    The external-flow study supplies pressure distributions at 150 km/h. The structural report records whole-assembly peaks of 379 MPa longitudinally and 307 MPa transversely, against a 240 MPa yield input These local peaks require further assessment. The report does not establish an unconditional pass for all wind results

Thermal and Flow Analysis

The airflow model and operating assumptions

  • Simplified CFD geometry of the enclosure and equipment

    Simplified equipment and enclosure geometry

  • CFD mesh of the enclosure

    1.6 million surface elements / 14 million volume cells

Thermal model inputs
MODEL INPUTSPECIFIED CONDITIONPURPOSE
Outdoor environment50°C ambientExternal thermal boundary
Battery-room AC supply15°C at 1,177 CFMConditioned air to the battery zone
PCS airflow560 CFMPower-conversion equipment airflow
Equipment-room exhaust675 CFMVentilation of the equipment zone
Transformer exhaust60 CFMVentilation of the transformer compartment

The steady-state conjugate heat-transfer study includes conduction, convection and radiation. Equipment heat loads and external thermal effects define the simulation basis

Thermal Results

Temperature distribution and airflow

  • Temperature contour in the battery room

    Battery room: 22.4°C average

    The study reports average room air at 22.4°C and a maximum battery-rack temperature of approximately 26°C with the specified AC supply

  • Airflow velocity plot in the battery room

    Airflow through the battery space

    Velocity plots show how air travels through the room. They support review of the ceiling, rack clearances and supply/return arrangement

  • Temperature contour in the equipment room

    Equipment room: 52°C average

    At a 50°C ambient boundary, the equipment-room study reports a 52°C average and a 62°C maximum room temperature

  • Surface temperature plot of the transformer enclosure

    Transformer: 141°C surface peak

    The report identifies heat accumulation at the transformer enclosure. It also reports average transformer-room air at 78°C

A specific finding for engineering review

The transformer hotspot needs further review of heat removal and the model assumptions. These values describe simulated conditions, with room-air and enclosure-surface temperatures identified separately

Fabrication Documentation

The details needed for manufacture

  • Structural assembly drawing sheet

    Structural fabrication package

    Assembly drawings define member positions, sections, dimensions and weld requirements. The BOM identifies components for the mechanical package

  • Detail drawing of service assemblies

    Service assemblies and interfaces

    Detailed drawings carry the cable tray, hoods, floor covers and equipment fixings into fabrication. They connect the overall arrangement to individual parts

Workshop Support

The design progressed into fabrication

  • Container enclosure under fabrication in the workshop

    Enclosure fabrication

    The October 2020 workshop records show the enclosure structure and sheet-metal integration. GTS supplied 3D views and cutout positions to support assembly

  • Louvre and fan openings cut into the container wall

    Openings and access

    The team coordinated louvre and fan openings on site. The PCS flange changed from a C to a Z profile to improve fastening access

  • Transformer hood and flange on the container

    Hood and flange integration

    Workshop feedback identified limited bolt access at the transformer hood. The team recorded a field welding solution and a flange change for a later iteration

Design Refinement

Revisions continued after workshop integration

November 2020 drawing of revised outdoor-unit and suppression-cylinder fixings

A November 2020 drawing records revised outdoor-unit and suppression-cylinder fixings with reinforcement details. The project history carries the design beyond its initial CAD release.

Documented Outcome

A coordinated enclosure design and physical build

Original project render of the container with its battery-access doors open

Design information that supported the build

The project brought equipment packaging, enclosure design and engineering analysis into one mechanical development package. Fabrication drawings and workshop feedback supported physical integration

Original project render showing the intended battery-access arrangement

Outcome

Engineering carried through to fabrication

The mechanical package supported fabrication and equipment integration. CAD and drawings established the build information, while FEA and CFD identified structural and thermal responses for engineering review

  • Industry Proven Frameworks
  • Get consultancy-level insights

Explore Detailed Case Study

Request a Quote

Tell us about your project

Fields marked * are required.

Choose a file (optional)

Drawings, CAD, images or ZIP (.pdf, .png, .jpg, .jpeg, .dwg, .dxf, .step, .stp, .iges, .igs, .stl, .zip), up to 15 MB.